Category: Projects Log

Bottom Paint, Through-hulls, Transducers and Topside Paint Job

Bottom Paint, Through-hulls, Transducers and Topside Paint Job

We went in for a bottom job, and to complete the electronics install with a new speed/depth/temp transducer and the forward-looking sonar transducer, but 'scope-creep' is inevitable. Here is a summary of what the almost three weeks out of the water entailed: 1. Old Transducer Removal: Extracted the old Raymarine depth transducer from the bow … Continue reading Bottom Paint, Through-hulls, Transducers and Topside Paint Job

Up the mast again (anemometer part two) and on with the Electronics install.

Up the mast again (anemometer part two) and on with the Electronics install.

Success!  We have wind speed and direction.  The anemometer is firmly fixed to the top of the mast and the cable is run.  Apart from a broken tap, the tapping was eventually scrapped in favor of screws, the procedure went fairly smoothly. Now, if we can only figure out why the wind speed only works … Continue reading Up the mast again (anemometer part two) and on with the Electronics install.